Monday, April 22, 2013

Construction Photos- Week 23

These were taken April 18th, but between Staff Day and having the weekend off, this was the first chance I've had to post them.
The glass walls for the quiet study rooms, the doors to be added later.
 

The adult fiction section the wall in the back of the picture
will hold the shelves for adult nonfiction.


The glass walls for the history room.

The glass around the manager's office doors.  Doors to be added later.




The drive up window now has glass.


Another picture of the break room.

The book drop room will have two book drops, one from outside
and one just inside the main entrance.
 




The circ desk, with the glass in the window.

They're adding pieces to the elevator.

The meeting room storage closet (left) and elevator closet (right). 
The meeting room kitchen is through the door to the elevator closet and turn right.
 


The meeting room.

The cafe seating area


The reading area
 

The main display area for the library
 

The YA area
 

Looking out towards the reading area.  YA is to the right.
 

Another view of the Circ desk
 

The reference desk will be in the right side of the picture,  the business center in the middle, then the manager's office, with the history room on the left.